This calculator helps construction engineers estimate the required crew size, daily output, and duration for various construction activities based on the standard CSI MasterFormat coding system.
How to use it?
Select Division: Start by choosing the main division (e.g., Concrete, Masonry).
Drill Down: Select Sub-Divisions until you reach the specific item you need.
Enter Quantity: Input the total quantity of work for your project.
Calculate: The tool will instantly show you:
Number of crews needed.
Total days to complete.
Detailed breakdown of laborers and equipment.
Key Terms Explained
Daily Output: The amount of work one crew can finish in a standard 8-hour day.
Man-Hours: Total working hours required by all laborers to complete one unit of work.
CSI MasterFormat: The industry standard for organizing construction specifications.
دليل الاستخدام: حاسبة فرق العمل والإنتاجية
ماهي هذه الأداة؟
تُستخدم هذه الحاسبة لمساعدة مهندسي التخطيط والمكتب الفني في تقدير حجم العمالة المطلوب، معدلات الإنتاج اليومية، والمدة الزمنية للأنشطة الإنشائية المختلفة بناءً على أكواد CSI MasterFormat العالمية.
كيف تستخدمها؟
اختر القسم: ابدأ باختيار القسم الرئيسي (مثل الخرسانات أو المباني).
حدد البند: اختر الأقسام الفرعية حتى تصل لبند العمل الدقيق.
أدخل الكمية: اكتب الكمية الإجمالية المطلوب تنفيذها في مشروعك.
اضغط "احسب": ستظهر لك النتائج فوراً وتشمل:
عدد الفرق المطلوبة.
عدد الأيام اللازمة للانتهاء.
تفصيل كامل للعمالة والمعدات (صنايعي، مساعد، خلاطة، إلخ).
مصطلحات هامة
Daily Output (الإنتاجية اليومية): كمية العمل التي يمكن لفريق واحد إنجازها في يوم عمل قياسي (8 ساعات).
Man-Hours (ساعات العمل): إجمالي الساعات التي يبذلها جميع العمال لإنهاء وحدة واحدة من العمل. وتستخدم لحساب التكلفة بدقة.
CSI MasterFormat: النظام القياسي العالمي لتصنيف الأعمال الإنشائية والمواصفات الفنية.